Wednesday, August 20, 2008

le bungee

The crane erector arrived first thing and spent most of the day oiling pulleys and cables and fixing the wiring. A repair had been carried out by the previous owner which resulted in a fault in the overload cut-out system so that instead of being able to bring the load back in, it went further out - which could have resulted in the crane toppling over! It's now up - and it's very high (17m to be precise). BB has come up with an idea for recouping the huge cost of having it transported here, towed down by M. Bouger and then erected - "le bungee" - offering bungee jumping! Mmmm. I wonder if our house insurance covers that?

The MOT man arrives on 3 September and then, all being well, work will commence.

1 comment:

Anonymous said...

Trial